Ranson Planning Commission: meeting of April 1, 2024
Jefferson County, West Virginia · from the public record · page built 2026-11-25
Documents on file
- Agenda: 2024-04-01 Ranson Planning Commission agenda · 84 pages · the government's copy · full readable version (free account)
- Minutes: 2024-04-01 Ranson Planning Commission minutes · 3 pages · read from a scan · text not yet checked, so nothing is quoted from it here · the government's copy · full readable version (free account)
- Packet: 2024-04-01 Ranson Planning Commission packet · 84 pages · the government's copy · full readable version (free account)
Agenda
As listed in the agenda.
- III. OLD BUSINESS (page 1)
- IV. PLANNING COMMISSION BUSINESS 1. 23-60-SP-2024.03.13 Public hearing - Applicant Larson Design Group submitted application for Wawa Convenience Store Legal Notice forW… (page 1)
- 2. 23-60-SP-2024.03.13 -Consideration Applicant Larson Design Group submitted application for WaWa Site Plan 23-60-SP-2024.03.13_-_wawa_ranson,_wv_site_plans_-_ss (1).pdf (page 1)
- 3. 23-63-FP- Public Hearing - Applicant Christopher Consultants LLC- Sykle Knuppel submitted Application- Final plat proposal for Briar Run Phase VI-B Lots 1 thru 38 & o… (page 1)
- V. ADJOURMENT (page 2)
- 1. Open Public Hearing (page 4)
- 2. Comments/questions from public (page 4)
- 3. Close Public Hearing (page 4)
- 1. Review supporting documents (page 6)
- 2. Commission discussion/questions for staff (page 6)
- 3. Vote (page 6)
- 2. Comments/questions from public (page 42)
- 3. Close Public Hearing (page 42)
- 2.1 Paved Surface Construction 56 Permanent Utility Asphalt Patch SY $ 15.00 75 (page 45)
- 4.1 Sanitary Sewer System 10 Core / Rechannel Manhole EA $ 1,200.00 1 11 Temporary Utility Asphalt or Cold Patch SY $ 15.00 40 (page 45)
- 4.2 Potable Water System 18 8" C-900 PVC Water Main LF $ 68.00 546 19 Temporary Utility Asphalt or Cold Patch SY $ 15.00 35 (page 45)
- 5.1 Storm Water Management & Storm Drainage Storm Drain Structures Inlet (not at curb) EA $ 3,000.00 3 Core / Rechannel Inlet EA $ 1,200.00 1 (page 45)
- 5.1 Civc Standards 1 Small Playground Tot Lot (< 10 Childred) EA $ 19,800.00 $ - 2 Medium Playground Tot Lot (10-50 Childred) EA $ 55,000.00 $ - 3 Large Playground Tot L… (page 53)
- 3. Specifications The work embraced herein shall be done in accordance with the provisions of all applicable (page 71)
- 7. Permits: Compliance with Law Developer shall, at Developer’s expense, obtain all necessary permits and licenses for the construction of such improvements, give all ne… (page 72)
- 9. Inspection by City of Ranson (page 72)
- 10. Subdivision Surety Developer shall post subdivision surety consistent with Ranson Municipal Code 16-80 et seq. See Exhibit A for surety documents. for Phase VI-8. (page 73)
- 16. Developer not Agent of City Neither Developer nor any of Developer’s agents or contractors are or shall be considered to be agents of City in connection with the per… (page 75)
- 21. Notices All notices herein required shall be in writing, and delivered in person or sent by registered mail, postage prepaid. Notices required to be given to City sh… (page 76)
- 23. Authority Any conflict arising from this Agreement shall be governed by and construed in accordance with (page 76)
- 1. THE PROPERTIES SHOWN HEREON ARE IDENTIFIED ON JEFFERSON COUNTY, RANSON (page 80)
- 2. THE PROPERTIES SHOWN HEREON ARE NOW IN THE NAME OF MARCUS ENTERPRISES (page 80)
- 4. THE PROPERTY SHOWN HEREON IS LOCATED ON THE FLOOD INSURANCE RATE (page 80)
- 5. THE CURRENT NATIONAL WETLANDS INVENTORY MAP DOES NOT SHOW (page 80)
- 6. ALL KNOWN EXISTING AND PROPOSED EASEMENTS AND RIGHTS-OF-WAY FOR THIS (page 80)
- 7. SERVICE LATERALS TO INDIVIDUAL LOTS OR SITES SHALL BE INSTALLED PRIOR TO (page 80)
- 8. PRIVATE WELLS AND/OR PRIVATE SEPTIC SYSTEMS FOR DOMESTIC USE ARE 9 (page 80)
- 10. LOT ACCESS IS LIMITED TO INTERIOR ROADS ONLY. THIS PLAN OF SUBDIVISION AND IN CONSIDERATION OF THE APPROVAL OF (page 80)
- 11. ALL RESIDENTIAL AND NON-RESIDENTIAL BUILDING LOTS SHALL HAVE STABILIZED THIS FINAL PLAT BY THE PLANNING COMMISSION, ESTABLISH THE (page 80)
- 13. NO STRUCTURES, FENCES, OR LANDSCAPING SHALL BE LOCATED IN THE EASEMENTS. SITE MAP THE SETTING OF MONUMENTS AND MARKERS HAVE BEEN COMPLIED P:\Projects\21258\002\SURVE… (page 80)
- 16. THE TOTAL RIGHT-OF-WAY DEDICATION SHOWN HEREON INCLUDES CECILY WAY, A (page 80)
- 6.25 S79°56'58"E 100.19' RBS D.B. 1263 PG. 421 7 RBS "E 90.49' 9.70' 2 2'4 (page 81)
- 8.1 DEDICATION 0.0258 AC. (page 81)
- 33. D.B. 982 PG. 575 PARCEL 3 (page 83)
How much of this board we hold
PLACES holds documents for 101 meetings of this board, 2016 to 2026. The board’s own full list of meetings has not been counted yet, so this may not be all of them.