Agenda

As listed in the agenda.

  1. 1. Planning Commission - Regular Meeting - May 1, 2023 7:00 PM IV. OFFICERS & COMMITTEE REPORTS (page 1)
  2. V. SPECIAL ORDER (page 1)
  3. VI. UNFINISHED BUSINESS (page 1)
  4. VII. NEW BUSINESS (page 1)
  5. 1. 23-29 BRR- RESOLUTION #PC-23-13 A resolution of the planning commission of the City of Ranson approving the Presidents Pointe 2 Bond reduction request of $5,917,101.6… (page 1)
  6. 1. The next Planning Commission Meeting is tentatively scheduled for . (page 1)
  7. II. ACCEPTANCE OF AGENDA (page 2)
  8. III. APPROVAL OF MINUTES (page 2)
  9. 1. Planning Commission - Regular Meeting - Jan 9, 2023 7:00 PMAccepted IV. OFFICERS & COMMITTEE REPORTS (page 2)
  10. V. SPECIAL ORDER (page 2)
  11. VI. UNFINISHED BUSINESS (page 2)
  12. VII. NEW BUSINESS (page 2)
  13. 1. Resolution #PC-23-09: A Resolution of the Planning Commission of the city of Ranson approving the final plat of “Presidents Pointe Phase 3” submitted by Stanley Marti… (page 2)
  14. 1. Review supporting documents attached. (page 5)
  15. 1. Review supporting documents attached. (page 9)
  16. 1.3 Earthwork 1 Strip Topsoil CY $ 4.13 0 $ - 2 Common Excavation CY $ 25.01 49799 $ 1,245,672.19 (page 14)
  17. 3.1 Landscaping 1 Transplanting Trees (6' or less) EA $ 148.50 0 $ - 2 Transplanting Shrubs EA $ 126.50 0 $ - (page 16)
  18. 2. Vote to hold a public hearing (page 21)
  19. 1. The Ranson Planning Commission hereby declares the applicant’s Site Plan application complete. (page 22)
  20. 2. The Ranson Planning Commission hereby approves the applicant’s Site Plan, a true copy attached to this Resolution. (page 22)
  21. 3. The Ranson Planning Commission shall affix its seal on the Site Plan and have the same recorded in the land records of Jefferson County. (page 22)
  22. 4. A copy of this Resolution shall be forwarded to the City Clerk. (page 22)
  23. 4. THE CONTRACTOR MUST STRICTLY COMPLY WITH THESE NOTES AND ALL SPECIFICATIONS/REPORTS CONTAINED HEREIN. THE CONTRACTOR MUST REGULATIONS. 4. THE LOCATIONS OF PROPOSED UT… (page 25)
  24. 6. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR MUST ENSURE THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN 5. THE CONTRACTOR MUST PROVIDE ALL "METHODS AN… (page 25)
  25. 7. THE CONTRACTOR MUST ENSURE THAT ALL WORK IS PERFORMED IN ACCORDANCE WITH THESE PLANS, SPECIFICATIONS/REPORTS AND PERFORM ALL REPAIRS AT THE CONTRACTOR'S SOLE EXPENSE.… (page 25)
  26. 4. THE CONTRACTOR IS FULLY RESPONSIBLE FOR VERIFYING EXISTING TOPOGRAPHIC INFORMATION AND UTILITY INVERT AND ANY OTHER PLANS THAT COMPRISE THE CONSTRUCTION DOCUMENTS. (page 25)
  27. 13. WHEN INCLUDED AS ONE OF THE REFERENCED DOCUMENTS, THE GEOTECHNICAL REPORT, SPECIFICATIONS AND RECOMMENDATIONS SET FORTH B. NOTIFY, AT A MINIMUM, THE MUNICIPAL ENGINE… (page 25)
  28. 21. THE CONTRACTOR MUST IMMEDIATELY IDENTIFY IN WRITING, TO THE ENGINEER OF RECORD AND BOHLER , ANY DISCREPANCIES THAT MAY OR RESULTS TO THE ENGINEER OF RECORD AND THE O… (page 25)
  29. 5. STORMWATER ROOF DRAIN LOCATIONS ARE BASED ON ARCHITECTURAL PLANS. THE CONTRACTOR IS RESPONSIBLE FOR CITY OF RANSON, (page 25)
  30. 5. INSTALLATION OF EROSION CONTROL DEVICES MUST BE IN ACCORDANCE WITH ALL OF THE MANUFACTURER'S AS DESCRIBED ABOVE. (page 25)
  31. 29. OWNER MUST MAINTAIN AND PRESERVE ALL PHYSICAL SITE FEATURES AND DESIGN FEATURES DEPICTED ON THE PLANS AND RELATED DOCUMENTS IN STRICT ACCORDANCE WITH THE APPROVED PL… (page 25)
  32. 13. THE CONTRACTOR MUST PROTECT ALL EXISTING TREES AND SHRUBS. THE CONTRACTOR MUST REFER TO THE LANDSCAPE AND/OR DEMOLITION PLAN(S) FOR TREE PROTECTION, FENCE LOCATIONS… (page 25)
  33. 15. THE CONTRACTOR MUST REFER TO GRADING PLANS FOR ADDITIONAL INFORMATION. THE CONTRACTOR MUST CLEAN EXISTING AND PROPOSED DRAINAGE STRUCTURES AND INTERCONNECTING PIPES… (page 25)
  34. 30. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ENSURING THAT ALL CONSTRUCTION ACTIVITIES AND MATERIALS COMPLY WITH AND CONFORM TO (page 25)
  35. 16. SOIL EROSION CONTROL MEASURES MUST BE ADJUSTED OR RELOCATED BY THE CONTRACTOR AS IDENTIFIED DURING SITE OBSERVATION IN ORDER TO MAINTAIN THE COMPLETE EFFECTIVENESS O… (page 25)
  36. 12. THE TOPS OF EXISTING MANHOLES, INLET STRUCTURES, AND SANITARY CLEANOUT MUST BE ADJUSTED, AS NECESSARY, TO DRAWN BY : DSH (page 25)
  37. 1. LIMITS OF SOIL DISTURBANCE = ± 3,485 SF - 0.08 AC. (page 28)
  38. 2. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE APPROXIMATE JOB NO. :VAB220039.00 AND HAVE NOT BEEN FIELD VERIFIED. CONTRACTOR SHALL DETERMINE ACTUAL LOCATIONS AN… (page 28)
  39. 1. CONTRACTOR TO PROVIDE MINIMUM PAVEMENT SECTION (OR MATCH EXISTING WHICHEVER IS GREATER) AND MATCH EXISTING CROSS-SLOPES IF ASPHALT PATCHING IS REQUIRED. SEE PAVEMENT… (page 29)
  40. 2. CONTRACTOR SHALL REFER TO ARCHITECT PLANS FOR THE EXACT DIMENSIONS OF THE BUILDING AND THE LOCATION OF DOORWAYS, UTILITIES, ETC. (page 29)

484 more in the full version.

How much of this board we hold

PLACES holds documents for 101 meetings of this board, 2016 to 2026. The board’s own full list of meetings has not been counted yet, so this may not be all of them.

All meetings of this board All boards in Jefferson County