  1. A. The provisions of this ordinance have been prepared with the intention of meeting the requirements of THE NATIONAL FLOOD INSURANCE ACT OF 1968 (42 U.S.C. 4001 et seq.… (page 29)
  2. B. Authority to adopt, administer and enforce this Ordinance is vested in the community pursuant to WEST VIRGINIA STATE CODES 7-1-3v, 7-1-3n and 7-1-3kk and WEST VIRGINI… (page 29)
  3. A. Promote the general health, welfare, and safety of the community. (page 29)
  4. B. Encourage the utilization of appropriate construction practices in order to prevent or minimize flood damage in the future. (page 29)
  5. C. Minimize danger to public health and safety by protecting water supply and sanitary sewage disposal, in cooperation with the County Sanitarian, and to protect natural… (page 31)
  6. D. Reduce financial burdens imposed on the community, its governmental units, and its residents, by preventing the unwise design and construction of development in areas… (page 31)
  7. 1. Words used in the present tense include the future tense (page 33)
  8. 2. The singular includes the plural. (page 33)
  9. 3. The plural includes the singular. (page 33)
  10. 4. The word “person” includes a corporation, unincorporated association or P partnership, as well as an individual. (page 33)
  11. 5. The Term “shall” or “will” is always mandatory. (page 33)
  12. 6. The word “building” or “structure” shall be construed as if followed by the phrase “or part thereof”. (page 33)
  13. 7. The word “Ordinance” shall refer to the Jefferson County Floodplain Ordinance. Section 2.2 Definitions (page 33)
  14. B. The Floodway Fringe area (F2) shall be those areas for which specific one hundred (100) year flood elevations have been provided in the FIS but which lie beyond the f… (page 45)
  15. C. The AE Area without Floodway (F3) shall be those areas identified as an AE Zone on the FIRM included in the FIS prepared by FEMA for which 100-year flood elevations h… (page 45)
  16. D. All new and replacement bridges, culverts and other stream crossings shall adhere to the relevant anchoring requirements contained in this ordinance. (page 51)
  17. A. Reasonably safe from flooding. B: Located in an identified Floodway, Floodplain, or other flood hazard area. (page 53)
  18. C. Are located in accordance with Zoning ordinance, Subdivision ordinance, and Floodplain ordinance building setbacks. (page 53)
  19. D. Designed (or modified) and adequately anchored to prevent flotation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads,… (page 53)
  20. E. Constructed by methods and practices that minimize flood damage. (page 53)
  21. F. Constructed with electrical, heating, ventilation, plumbing and air conditioning equipment and other service facilities that are designed and/or located so as to prev… (page 53)
  22. G. Approved by County Health Department for Well, Septic and other permits. (page 53)
  23. A. Name and address of applicant (page 53)
  24. B. Name and address of owner of land on which the proposed development/construction is to occur. (page 53)
  25. C. Name and address of contractor performing the work. D. A description of site location sufficient to locate the project. (page 53)
  26. E. A sketch plan of the site showing the exact size and location of the proposed building construction as well as any existing buildings or structures on the site. (page 53)
  27. A. Elevated Structures: (page 55)
  28. 1. A plan showing the size of the proposed structure and its relation to the lot boundary and where it is to be constructed on the lot. (page 55)
  29. 2. A determination of elevations of the Base Flood, existing ground, proposed finished ground and lowest floor, certified by a Registered Professional Engineer or Survey… (page 55)
  30. 4. Plans showing the methods used to protect utilities (including sewer, water, telephone, electric, gas, etc.) from flooding to three feet above the Base Flood Elevatio… (page 55)
  31. B. Flood Proofed Structures: (page 55)
  32. 1. Plans showing details of all flood proofing measures, prepared by a Registered Professional Engineer, and showing the size of the proposed structure and its relation… (page 55)
  33. 2. A determination of elevations (elevation certificate) of the Base Flood, existing ground, proposed finished ground, lowest floor, and flood proofing limits; certified… (page 55)
  34. C. Elood Resistant Construction: (page 57)
  35. 2. A post-construction elevation report or certificate, based on finished construction, prepared by a licensed Professional Surveyor. The report/certificate shall certif… (page 57)
  36. B. Site Plan: (page 61)
  37. A. Name of registered professional engineer, licensed professional surveyor or other qualified person responsible for providing the information required in this section. (page 61)
  38. B. A map showing the location of the proposed subdivision and/or land development with respect to the county’s floodplain areas, the proposed lot sites, and areas to be… (page 61)
  39. D. Where the subdivision and/or development project lie partially or completely in the floodplain areas, the preliminary plat or site plan shall include detailed informa… (page 61)
  40. A. Basements and Lowest Floors (page 65)

47 more in the full version.

How much of this board we hold

PLACES holds documents for 1,261 meetings of this board, 2001 to 2026. The board’s own full list of meetings has not been counted yet, so this may not be all of them.

All meetings of this board All boards in Jefferson County