As listed in the agenda.

  1. 2. Utility Manager Report a. Engineering Services Agreement — Hatch / Chester b. Task Order No. 1 — Hatch / Chester c. Route 9 Sewer Project Statement d. Next Meeting Da… (page 1)
  2. 3. Approval of Bills (page 1)
  3. 1.3. Independent Contractor. In the performance of the services under this agreement, (page 5)
  4. 1.5. Definitions. Wherever used in this Agreement the following terms have the (page 7)
  5. 1.5.1. Additional Services. Additional Services means the services to be performed for, or furnished to, CTUB by ENGINEER described in Section 3. (page 7)
  6. 1.5.3. Basic Services. Basic Services means the services to be performed for or furnished to CTUB by ENGINEER generally described in Section 2 and as set forth in each s… (page 7)
  7. 1.5.5. Contractor. Contractor means the person or entity with whom CTUB enters into a written agreement covering construction work to be performed or furnished with resp… (page 7)
  8. 1.5.6. ENGINEER’s Consultant. ENGINEER’s Consultant means a person or entity having a contract with ENGINEER to provide Basic or Additional Services as ENGINEER’s indepe… (page 7)
  9. 1.5.7. Program Manager. ENGINEER’s employee assigned to CTUB and responsible for the conduct of the work, schedule and fee of all Task Orders to be completed under this… (page 7)
  10. 1.5.8. Reimbursable Expenses. Reimbursable Expenses means the direct expenses (page 7)
  11. 1.5.10. Scope of Work. Written guidance provided by CTUB to the ENGINEER to communicate expectations and to assist ENGINEER in developing the Work Plan for an individual… (page 9)
  12. 1.5.11. Standard General Conditions. Standard General Conditions mean the CTUB General Conditions of the Construction Contract, most current version. (page 9)
  13. 1.5.12. Task Order. The individual Project assigned to the ENGINEER containing the Work Plan, identification of key personnel (including Engineer’s Consultant, if needed… (page 9)
  14. 1.5.13. Team Charter. The Project document produced by the ENGINEER in collaboration with CTUB establishing roles and responsibilities of individuals and organizations:… (page 9)
  15. 2.1. Report Phase. Under this phase, and for each Task Order so required, ENGINEER shall: (page 11)
  16. 2.1.1. Establish a Team Charter Meeting with CTUB to ensure and clarify roles and responsibilities. (page 11)
  17. 2.1.3. Identify and analyze requirements of governmental agencies having jurisdiction to approve portions of each Task Order designed or specified by ENGINEER. (page 11)
  18. 2.1.4. Evaluate various alternate solutions available to CTUB and, after consultation with CTUB, recommend to CTUB those solutions that in ENGINEER’s judgment best meet… (page 11)
  19. 2.1.5. Provide, within the period stipulated in each Task Order, a Report which will contain the statement of CTUB’s requirements and, as appropriate, will contain schem… (page 11)
  20. 2.1.6. ENGINEER’s services under the Report Phase will be considered complete when CTUB has accepted the Report in writing. (page 13)
  21. 2.2. Design Phase. After acceptance of the Report by CTUB, selection by CTUB of a recommended solution and indication of any specific modifications or changes in the sco… (page 13)
  22. 2.2.2. Advise CTUB if additional studies, data or other information or services of the types described in Paragraph 4.5 are necessary and assist CTUB in obtaining such s… (page 13)
  23. 2.2.3. Based on the information contained in the PER, submit a revised opinion of Construction Cost and any adjustments to Total Project Costs known to ENGINEER, which w… (page 13)
  24. 2.3. Permit Phase. The phase will run concurrently with the Report and Design Phases and is intended to provide focus on the myriad of permits that are required for cons… (page 15)
  25. 2.3.1. File applications for permits and approvals of such governmental authorities that have jurisdiction to review or approve the final design, the Project or any part… (page 15)
  26. 2.4. Bidding Phase. After acceptance by CTUB of the ENGINEER’s Drawings, Specifications and other Design Phase documentation, and upon written authorization to proceed,… (page 15)
  27. 2.4.1. Assist CTUB in advertising for and obtaining bids for construction, materials, equipment and services; and, attend pre-bid conferences, if any. (page 15)
  28. 2.4.2. Issue Addenda to CTUB for distribution as appropriate to clarify, correct or change the Bidding Documents. (page 15)
  29. 2.4.3. Consult with CTUB as to the acceptability of subcontractors, suppliers and other persons and entities proposed by contractor for those portions of the work as to… (page 15)
  30. 2.4.4. Attend the bid opening and assist CTUB in prepare bid tabulation sheets, evaluating bids and assembling and awarding contracts for construction, materials, equipm… (page 15)
  31. 2.4.5. The Bidding Phase will terminate and the services to be performed or furnished thereunder will be considered complete upon the issuance of the Notice to Proceed f… (page 15)
  32. 2.5. Construction Phase. During the Construction Phase: (page 15)
  33. 2.5.2. Visits to Site and Observation of Construction, In connection with observations of the work of Contractor while it is in progress: (page 17)
  34. 2.5.5. Change Orders and Work Change Directives. ENGINEER shall recommend Change Orders and Work Change Directives to CTUB as appropriate, and shall prepare Change Order… (page 17)
  35. 2.5.1. Substitutes. ENGINEER shall evaluate and may only recommend to CTUB the acceptability of substitute or “or-equal” materials and equipment proposed by Contractor. (page 19)
  36. 2.5.9. Disagreements between CTUB and Contractor. ENGINEER shall render recommendations on all claims of CTUB and Contractor affecting price, time, acceptability of the… (page 19)
  37. 2.5.16. Duration of Construction Phase. The Construction Phase will commence with the issuance of the Notice to Proceed by CTUB and will terminate upon written recommend… (page 21)
  38. 2.6. Operational Phase. During the Operational Phase, ENGINEER shall, when requested by CTUB: (page 21)
  39. 2.6.1. Provide assistance in connection with refining and adjusting any equipment or system. (page 21)
  40. 2.6.2. Assist CTUB in training CTUB’s staff to operate and maintain the equipment and/or process. (page 21)

62 more in the full version.

How much of this board we hold

PLACES holds documents for 194 meetings of this board, 2018 to 2026. The board’s own full list of meetings has not been counted yet, so this may not be all of them.

All meetings of this board All boards in Jefferson County