Charles Town Planning Commission: meeting of April 25, 2022
Jefferson County, West Virginia · from the public record · page built 2026-11-25
Documents on file
- Agenda: 2022-04-25 Charles Town Planning Commission agenda · 96 pages · the government's copy · full readable version (free account)
- Minutes: 2022-04-25 Charles Town Planning Commission minutes · 2 pages · the government's copy · full readable version (free account)
Agenda
As listed in the agenda.
- III. PUBLIC PORTION (page 1)
- 1. 5586: Norborne Glebe Phase 9 and 10A Sketch plan (page 1)
- IV. NEW BUSINESS (page 1)
- 1. 5587: Springfield Development Sketch Plan (Introduction) (page 1)
- 2. 5589: Norborne Glebe Phase 14B Performance Bond (page 1)
- 3. 5590: Norborne Glebe Candlewood Drive Bond Reduction (page 1)
- 2.1 Planning Commission Meeting: 04/25/22 07:00 PM 101 E. Washington Street Department: Planning Commission Charles Town, WV 25414 Category: Information Only Initiator:… (page 2)
- II. APPROVAL OF MINUTES (page 3)
- 1. Planning Commission - Regular Meeting - Feb 28, 2022, 7:00 PM (page 3)
- III. PUBLIC PORTION (page 3)
- A. Joe and Joan Coffee- Annexation (page 3)
- 1. 5509: Joe and Joan Coffee- Annexation (page 3)
- B. Waiver- 326 E Liberty Street- Site Design Standards (page 4)
- IV. NEW BUSINESS (page 4)
- A. NG-Ph 9 and 10a Sketch plan (introduction) (page 4)
- 1. 5508: NG-Ph 9 and 10a Sketch plan (introduction) (page 4)
- V. NORBONE GLEBE PHASE14B- SLD-2021-02-LDP (page 4)
- 1. 5515: Norbone Glebe Phase14B- SLD-2021-02-LDP (page 4)
- 3.1 Planning Commission Meeting: 04/25/22 07:00 PM 101 E. Washington Street Department: Planning Commission Charles Town, WV 25414 Category: Information Only Initiator:… (page 6)
- 1. Finding an application "Complete." (page 8)
- 2. A Public Hearing (page 8)
- 1. Easements shall be given to the Jefferson County Public Service District for the construction and maintenance of sewer facilities, as depicted herein. Minimum Pipe Si… (page 19)
- 1. Methods and materials used in the construction of the improvements herein shall conform to current Jefferson County Construction Standards and (page 19)
- 2. Installation and maintenance of water and sewer lines shall be in accordance with the WV Department of Health, Jefferson County Public Sewer District, the to provide… (page 19)
- 3. Complete water lateral prior to final paving. EXISTING EDGE OF PAVEMENT (page 19)
- 3. Where dead-end mains occur they should be provided with a fire hydrant, for flushing purposes. performing portions of the work. (page 19)
- 5. The approval of these plans in no way relieve the developer, the contractor, or their agents of any legal responsibility which may be required by the code of 10. A ho… (page 19)
- 4. All service lines will be no deeper than 36" at the meter location to allow access to the setter by the meter installers. Deeper service lines may be acceptable if a (page 19)
- 6. All multi-meter installations, such as a business or apartment complex are to be set in an outside vault, or an accessible mechanical room, and are to be supplied (page 19)
- 13. When grading is proposed within easements of utilities, letters of permission from all involved companies must be provided to Jefferson County & Charles Town Utility… (page 19)
- 10. The CTUB must inspect all work. The contractor must give 24-hour notice to the CTUB for an inspection request. The CTUB may request as-built sketches, photos etc. (a… (page 19)
- 11. All West Virginia Public Service Commission and WV Health Department, rules and regulations, applying to water and sewer must be followed, and all local state PROPOS… (page 19)
- 16. All utilities to be located underground. DRAINAGE DIVIDE Field Copies of Construction Information WV4. Design features relating to construction or to regulation, con… (page 19)
- 18. The developer will be responsible for the relocation of any utilities which is required as a result of his project. The relocation should be done prior to Open Excav… (page 19)
- 2. The shape of the trenches in the "pipe zone" (which shall be construed to be that portion of the trench between the trench bottom and an elevation 1 foot above the ID… (page 19)
- 23. Refer to Geotechnical Engineer for methods, materials and details for construction of all earthwork activities. (page 19)
- 1. Service connections shall be made as indicated on the Contract Drawings. ADDITIONAL SPACES PROVIDED: 0 SPACES (page 19)
- 2. The Contractor shall furnish all fittings required to make the necessary connections. All service line connections shall be made in the presence of the CTUB TOTAL PAR… (page 19)
- 1. All bends in excess of 10 deg, plugs, caps, tees, and wyes branches along pipelines shall be adequately blocked or anchored to prevent the lines from pulling apart un… (page 19)
- 4.1 Planning Commission Meeting: 04/25/22 07:00 PM 101 E. Washington Street Department: Planning Commission Charles Town, WV 25414 Category: Information Only Initiator:… (page 22)
5 more in the full version.
Motions and votes recorded in the minutes
Each line is the minutes’ own wording. Check the government’s copy before relying on it.
- Mr. Hynes moved to approve the March 28, 2022 meeting minutes. Ms. Derr seconded the motion, and it passed unanimously. (minutes, page 1; moved by Hynes, seconded by Derr; recorded result: passed, unanimously)
- RESULT: APPROVED [UNANIMOUS] MOVER: Jeff Hynes, Councilmember SECONDER: Jessica Derr, Secretary AYES: Paonessa, Hynes, Derr ABSENT: Long, Cummings (minutes, page 1; moved by Jeff Hynes, seconded by Jessica Derr; recorded result: approved, UNANIMOUS)
- Ms. Derr moved to open the public hearing on Norborne Glebe Phase 9 and 10A Sketch Plan. Mr. Hynes seconded the motion, and there was no objection. (minutes, page 1; moved by Derr, seconded by Hynes; recorded result: passed)
- Mr. Hynes moved to close the public hearing. Ms. Derr seconded the motion, and there was no objection. IV. NEW BUSINESS (minutes, page 1; moved by Hynes, seconded by Derr; recorded result: no objection)
- Mr. Hynes moved to approve the Springfield Development Sketch Plan as "complete" and schedule a public hearing at the May 23, 2022 Planning Commission meeting. Ms. Derr seconded the motion and it passed unanimously. (minutes, page 1; moved by Hynes, seconded by Derr; recorded result: passed, unanimously)
- RESULT: APPROVED [UNANIMOUS] MOVER: Jeff Hynes, Councilmember SECONDER: Jessica Derr, Secretary AYES: Paonessa, Hynes, Derr ABSENT: Long, Cummings (minutes, page 2; moved by Jeff Hynes, seconded by Jessica Derr; recorded result: approved, UNANIMOUS)
- Ms. Derr moved to recommend City Council initiate a Performance Bond in the amount of $1,961,538.69; an increase of $98,033.38 from the original amount of $1,863,505.31 due to the updating of nine (9) Performance Bond items from the original Performance Bond. Mr. Hynes seconded… (minutes, page 2; moved by Derr, seconded by Hynes; recorded result: passed, unanimously)
- RESULT: APPROVED [UNANIMOUS] MOVER: Jessica Derr, Secretary SECONDER: Jeff Hynes, Councilmember AYES: Paonessa, Hynes, Derr ABSENT: Long, Cummings (minutes, page 2; moved by Jessica Derr, seconded by Jeff Hynes; recorded result: approved, UNANIMOUS)
- Mr. Hynes moved to recommend City Council reduce the Performance Bond from $473,948.19 to $171,237.28 and the Land Disturbance Bond from $61,782.45 to $41,095.86. Ms. Derr seconded the motion and it passed unanimously. (minutes, page 2; moved by Hynes, seconded by Derr; recorded result: passed, unanimously)
- RESULT: APPROVED [UNANIMOUS] MOVER: Jeff Hynes, Councilmember SECONDER: Jessica Derr, Secretary AYES: Paonessa, Hynes, Derr ABSENT: Long, Cummings (minutes, page 2; moved by Jeff Hynes, seconded by Jessica Derr; recorded result: approved, UNANIMOUS)